Contact Form
Images, PDF or Office documents, up to 10 MB each

Men’s Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness

Seamless Knitwear Construction & Fabric Notes

Summer-Fit Athletic Short-Sleeve POLO Shirt. smooth and structured fabric surface with horizontal stripe texture, while featuring moisture-wicking, UPF100+ UV protection, and contact coolness functionality. The design of fold-line segmentation and color-block splicing enhances the sense of design and enriches the visual effect.

Application Scenarios

Sports & Leisure / Daily Life

Fit Description

ACTIVE – Athletic Fit

Wholesale Men’s Quick-Dry Seamless Cooling UV Protection: MOQ, Sampling & Lead Time

Built for repeat programs — every run is a full custom build, from 100 pcs per style per colour. Sampling runs 3–7 days, followed by 15–25 days for bulk after sample sign-off.

  • Machinery: Santoni seamless, 12–20 gauge, engineered zoning
  • Labels: heat-transfer label instead of a stitched woven tag
  • Structure detail: body-mapped compression and ventilation zones
  • Logo work: flat embroidery, 3D puff, screen print, heat transfer, woven patch
  • QC: inline inspection plus final AQL 2.5 check before shipment

OEM, ODM and private label are all supported. 18,000+ sqm of floor space, 4 lines, 180+ workers, ISO 9001 since 2009 — every order gets inline QC and a final AQL inspection. Request a quote — Send a tech pack or a reference photo and we will price it within 24 hours.

Categories: ,
Share your love
Men’s Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness
Men's Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness
Men's Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness
Men's Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness
Men's Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness
Men's Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness
Men's Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness
Men's Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness

Reviews

There are no reviews yet.

Be the first to review “Men’s Quick-Dry Seamless Cooling UV Protection Short-Sleeve POLO Shirt for Fitness”

Your email address will not be published. Required fields are marked *

Specifications for this seamless and bonded garment

Figures below are for this style as described. Anything not listed is confirmed on the approved sample before bulk.
ConstructionSeamless knit
WeightConfirmed against the approved sample
PerformanceMoisture wicking, Quick dry, UV protection
Decoration shownEmbroidery, Heat transfer, Printing
CustomisationWoven labels, printed neck labels, hangtags, barcode stickers and polybags, all made to your artwork
Minimum order100 pcs per style per colour
Bonded styles200 pcs per style per colour
Sampling3–7 days
Bulk lead time15–25 days after sample approval, transit excluded
InspectionAQL 2.5 final random inspection, ISO 9001 factory since 2009

Ordering this seamless and bonded garment

You can start from a tech pack, a reference sample or a sketch. Send whichever you have together with the target quantity, size set, colour reference and decoration position. Fields that are still open are confirmed with you before a sample is cut, so the first sample matches what you will approve for bulk.

Every style is cut and sewn on our own floor in Dongguan or Hunan and inspected to AQL 2.5. Labels, hangtags and polybags are quoted with the garment and packed to your artwork, so cartons leave the floor ready for your own warehouse or your customer.

Questions buyers ask about this style

What is the minimum order for this seamless and bonded garment?

100 pcs per style per colour. Bonded constructions start at 200 pcs per style per colour.

How long does a sample take?

Sampling takes 3–7 days once the fabric, colour and artwork are confirmed. Sampling is charged, and the fee is credited against the bulk invoice when a single style reaches 300 pcs on the first order.

How long is bulk production?

Bulk production takes 15–25 days after the sample is approved. Transit time is not included and is quoted separately.

TOP